Skip to content
+39 0424 85688 info@cidoniostampi.it ISO 9001:2015 · TÜV SÜD
3D design of a progressive die, view 2

News

Pilot die: how to reduce risk on new parts

For complex or new parts, a pilot die validates the critical forming stages before the final die is built.

Why a pilot die?

When a part is new or complex, validating the forming stages in advance avoids costly modifications to the final die.

The job cycle

Feasibility study, pilot die, design, construction, try-out and support: every stage is documented and becomes know-how.

Let’s talk about your project

Send us your drawing: technical response within 24 working hours.

Send us your drawing. Technical reply within 24 hours.

Talk directly to the people who design and build your die: no middlemen, reliable lead times and certified quality since 1969.

  • Since 1969
  • ISO 9001 · TÜV SÜD
  • Reply in 24 h
  • Sheet 0.05–12 mm